It has been a while since the last post so I thought I would update everyone about what has been happening. With short working weeks with Easter and Anzac Day, as well as being short staffed due to a family bereavement, it has been fairly slow progress with the fairway vertidraining.
We will finish all vertidraining early next week and it should help with removing surface water when we eventually get heavy rainfall. This month has bought a change in weather with cooler conditions, regular rainfall without any downpours and some strong winds. Winter is just around the corner.
The cooler weather has bought about a slow down in turf growth so the mowing has reduced and cutting heights have been raised slightly to maintain good turf density through winter. One issue we deal with this time of year is the increased number of worm castings on the surface of the fairways. The castings get smeared on the surface with machinery, golf carts and foot traffic and the fairways look quite muddy. A few years ago we had a chemical that had good long term control of the worms, but unfortunately that is now off the market and there is nothing that is available that has good control and not too expensive. We are trying to acidify the surface of the fairways with regular applications of Sulphate of Ammonia to try and discourage the worms. This will be an ongoing process.
Thursday, 30 April 2015
Monday, 23 March 2015
Fairway Vertidraining
We have started vertidraining the fairways with 18mm solid tynes to try and break up the hardpan under the surface. At the moment we are concentrating on the low areas on fairways that caused us problems last year with ponding for long periods of time after we received heavy rain early last year.
We have had a report done on our drainage issues in these areas by NZSTI and one of the recommendations in that report was to try and shatter the layer of heavy, silty loam that sits on top of the sand profile. Our worst layer is on the 17th fairway which is more than 300mm thick in places and vertidraining will only punch down to about 250mm deep. I am hoping that we have some shattering affect that will crack through the layer in places and give us better water infiltration when we do get heavy rain. At least we will have a lot more air space in the soil profile that will hold more moisture when it does rain and hopefully get it away from the surface.
At the moment we have vertidrained the low areas on the 8th, 9th &17th fairways 3 times and increased the tyne depth 25 mm each time because the ground is so hard and the machine can't cope with full depth straight away. We are now at 175mm deep and will probably need to tyne these areas at least 3 more times before we are at our maximum depth. When we have completed these areas we will start on all fairways before winter hits. Most of our fairway drain fairly well because we don't have many areas with thick layers of silty loam so these won't need to be treated so severely and to such a depth. We should be able to easily punch holes down to 150-175mm without much problem as long as we avoid shallow pipework and cable which is always a possibility.
![]() |
| vertidrain with 18mm solid tyned |
![]() |
| vertidrain holes in one of the hardpan areas on 17th fairway |
Sunday, 8 March 2015
Rain
Overnight our weather station recorded 11.7mm of rainfall which is the highest single rain event in 24 hours since 18/6/14.
Our yearly total for 2015 of 42.6mm is down half on the historical average of 83mm for the first 2 months of the year and our total of 123.9mm for the last 6 months is also down more than half on the historical average of 268mm.
I hope this change of seasons doesn't bring the rainfall that we received in March & April of last year where we were saturated in several parts of the golf course.
Our yearly total for 2015 of 42.6mm is down half on the historical average of 83mm for the first 2 months of the year and our total of 123.9mm for the last 6 months is also down more than half on the historical average of 268mm.
![]() |
| Overnight rainfall data |
![]() |
| Soaking rain on Friday |
Sunday, 1 March 2015
Course Update
![]() |
| Good turf cover after 10 days |
This week we vertidrained the tees to keep the water infiltration continuing through the soil profile. We are still having warm, dry conditions so this procedure helps with getting water to where the turf needs it - the rootzone.
Sunday, 22 February 2015
Course Update
![]() |
| 12mm solid tynes at 150mm depth |
![]() |
| Turf sand spread on 11th green |
![]() |
| Cushman topdresser |
One negative occurrence during the week was a damaged irrigation control cable near the 6th green that was caused by the vertidrain. Over the years we have vertidrained the surrounds of this green half a dozen times with out ever hitting the cable. This time the cable was severed and we found it using a cable locator(borrowed from Richard at Waitikiri GC) about 75-100mm below the surface. I am quite sure that this won't be the last time we hit a shallow cable because the reality is we don't know for sure where every bit of cable runs, and at what depth. In this situation we uncovered quite a length of cable and proceeded to repair it and bury it at a depth of 350mm where it won't be in danger of being hit with machinery in the future.
![]() |
| Cable break when hit by the Vertidrain |
![]() |
| Irrigation cable at a shallow depth |
Friday, 6 February 2015
Course Update
This last week has continued with warm, dry and now, windy conditions. We have managed to keep the moisture content on the greens and tees to a good level and as usual this time of year the mounded high areas on the fairways tend to dry out. This summer we have applied wetting agent to the high areas on fairways as well as the greens and tees. This approach has paid dividends with tinges of green throughout all sprayed areas on the fairways. Not only has it held colour, but it has maintained a better turf density than previous years where it would normally thin out into bare spots. We are still at the early stages with this program and I would hope for better turf coverage each year as we progress. This is only part of our fairway program but it appears that it has been quite beneficial so far.
As I mentioned in the last post about the unusual sprinkler repair with the broken pieces of fibrolite pipe, how many times will this occur! Well I didn't have to wait long. This week the sprinklers on the ladies 6th tee wouldn't shut down properly. As these are a bank of 4 sprinklers controlled by one valve, the problem had to be in the valve. After dismantling the valve I found a large chunk of fibrolite pipe jammed in the valve housing. With the debris removed and valve reassembled, the sprinklers worked fine.
I had a small window of opportunity to spray the greens for weed control (Pratia & Cotula) this week. We had one morning with no wind early on so I managed to get a herbicide and insecticide application on with just under a fortnight to go until renovations on the greens. By the time greens have recovered from the coring and topdressing the weeds should get quite a touch up and the Browntop bent should grow through the weak areas. Next week we will putting on a foliar spray of Sulphate of Ammonia to keep the turf ticking along.
As I mentioned in the last post about the unusual sprinkler repair with the broken pieces of fibrolite pipe, how many times will this occur! Well I didn't have to wait long. This week the sprinklers on the ladies 6th tee wouldn't shut down properly. As these are a bank of 4 sprinklers controlled by one valve, the problem had to be in the valve. After dismantling the valve I found a large chunk of fibrolite pipe jammed in the valve housing. With the debris removed and valve reassembled, the sprinklers worked fine.
![]() |
| Valve for ladies 6th tee(note the tree roots from nearby trees) |
![]() |
| Fibrolite pipe jammed in the valve |
I had a small window of opportunity to spray the greens for weed control (Pratia & Cotula) this week. We had one morning with no wind early on so I managed to get a herbicide and insecticide application on with just under a fortnight to go until renovations on the greens. By the time greens have recovered from the coring and topdressing the weeds should get quite a touch up and the Browntop bent should grow through the weak areas. Next week we will putting on a foliar spray of Sulphate of Ammonia to keep the turf ticking along.
With no real rain in the short term forecasts we will remain vigilant with the irrigation and keep the greens in good shape so that they recover well from the renovations
Monday, 26 January 2015
Unusual sprinkler problem
I had noticed an unusual water pattern around one of our sprinklers on the 11th fairway on the weekend. When I turned the twin row sprinklers on to test them, one popped up normally and the other dribbled out and wouldn't pop up properly.
![]() |
| Irregular watering pattern on the 11th fairway |
After dismantling the sprinkler, checking the valve assembly, solenoid assembly, selector stem and the screen at the base of the sprinkler casing, I reassembled the sprinkler and gave it a test run. Still no luck. With the sprinkler drive removed from the casing and manually turning the sprinkler on it appeared to have decent flow. I then reassembled the sprinkler again and gave it another run - still no good.
![]() |
| Removal of the sprinkler |
Having tried everything I know to find an obstruction in the sprinkler the next step was the pipework. Starting with the swing joint I found shards of broken fibrolite pipe in one of the elbows and further investigation found more in the pipe connecting the swing joint. It took some time to remove it all and recommission the sprinkler. Again another test and success!!!
![]() |
| Debris in swing joint |
![]() |
| Debris from the pipe |
This debris is the remains of damage caused by the earthquakes 4 years ago!!! Who knows how many more times we need to do this.
![]() |
| Sprinkler now working perfectly |
Subscribe to:
Posts (Atom)














.jpg)






